INFORMÁCIÓ ÉS AJÁNLATKÉRÉS
INFORMATION AND QUOTATION
Vissza
Home > News > When a dreamt-of work of art becomes a reality

When a dreamt-of work of art becomes a reality

Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-2
2018 / 10 / 10

Properties being created in an ongoing KAV project may nearly be interpreted as works of art. No company with relevant references could be found, either in Hungary or abroad, for the implementation of buildings that were considered unique at the European level too. We talked about this special job with Mihály Fodor, the Managing Director of the implementing company, and András Havasy, the project’s Technical Director.

If we look at the buildings under construction, we see that it is a standalone project not only in Hungary but also in Europe. How did you start the implementation?

András Havasy: Right from the first moment, it was an important aspect for the project owners to create something completely unique, also at the European level, thus giving respect to the spirit of this unique construction project. The development programme, developed during the design phase, contained numerous individual solutions, from the artistic design to the special technical arrangements. We were assigned this real estate development-related implementation task as a subsidiary of our owners, and we feel that the uniqueness of this project absolutely matches our company.

It is not only the property’s surfaces that are special but also that the materials and methods used represent very high quality. What are the challenges lying in this project for the implementing company?

A. H.: It was difficult to find the appropriate contractors that are able to represent this premium quality on the designers’, builders’ and technical inspectors’ side. All the details of it were our tasks, and in todays’ overloaded market it is not easy to find subcontractors for a job involving such challenges. During the tender for contractors, it became clear tor the bidders that this was about taking up a fully unique implementation job that nearly qualifies as artisan work or building statuary. It involved a lot of pressure to find suitable partners who were not only capable of completing it but of working with enthusiasm and love, while remaining within a budget that would keep the development viable.

Why did you find KAV to be suitable partner for this job?

A. H.: During the selection process we did not only have a tender for general contractors but also separate tenders for various special work elements requiring greater attention, including, for example, building engineering, gardening works and the issue of closing systems. We knew that the closing system tender would be a difficult task, due to the proper coordination of the technical preferences of the various contractors and the unique technical solutions of the project, and the comparability of the quotes. We started the selection process with five companies; some of them dropped out quickly, namely market players that realised early on that it was not about the usual condominium arrangement, but serious nodal solutions and difficult implementation work could be expected. Finally we got to KAV, because their engineering preparedness and their energy devoted to understanding the project’s philosophy was convincing at all consultations. All in all, they have won our trust with their unique solutions linked to the development concept and their appropriate technical support.

Now you are in the middle of the implementation process. Do you still feel safe with them?

A. H.: Yes. The fairness and conscientiousness experienced during the tendering is also showing during the implementation. And when some kind of tension starts to build, the managing directors of KAV and PBG Ingatlan sit down at the table almost immediately and they talk through the situation and seek a proper solution jointly rather than writing letters and playing tactical games. And so far this has always worked.

What kind of unique solutions will be implemented in this project in terms of closing systems?

A. H.: For example, the implementation development of the large format and arched glasses was a serious technical challenge. We have to highlight the special energy characteristics of these glass panels; their dimensioning and other specialised trade consultations were also completed by KAV’s colleagues. Nodal complexity was also a special task, mainly for the connecting structures. These require daily technical management at the work site, even after thorough planning.

A great many trade groups are involved together on this project, and many times they wash away the boundaries between them. How is it possible to coordinate and keep things under control?

A. H.: Due to the very complicated building design, even the slightest change generates serious technical issues, which means lots and lots of tasks to agree on. We hold two consultations a week, with a changing focus, one for the designers and one for the contractors, where we aim to respond to all questions. The contractors’ consultation is intended to draw the “red lines” in the technical and scheduling levels that may prevent the different jobs from relying on each other and making the proper progress, and at the designers’ consultation we deal with technical issues arising while’ implementing the designs, and which need to be responded to at the appropriate depth and with due care.

What are the most important expectations towards your contractor partners?

A. H.: A constructive attitude is indispensable. Avoiding responsibility also will not work in this job. Here all specialty trades must think jointly in order to find the appropriate solutions. I believe that it is a priority to find contractors where constructive and forward thinking is present.

Mihály Fodor: This is not a classical real estate development project, since we have three other co-owners that work in completely different professions, and have completely different kind of tasks, investments and missions. We therefore always have to keep in mind that the construction industry climate that poisons many projects simply cannot emerge here. When we, as operators, decide in certain issues instead of the other three co-owners and participate in negotiations, we cannot behave like a classic construction industry actor, and we also expect this from our partners.

A. H.: Since this is such a unique project that nobody had any references, in several cases human factors, the personal approach and moral ethos are particularly important, apart from professional experience.

What needs to be implemented to make you satisfied at the end of the process?

M. F.: As we expressed it with our co-owners, the work of art we dreamt of must spring into existence. It is a lot more exciting to work through a project that starts from the intuition of an artist. For this we needed a sufficiently flexible design firm. If someone looks at the design or the house already under construction, they will see immediately that these are not simple buildings but a lot more. The content of the project is not “just” implementation but to manifest the idea of the artist. Now, as we see the arched slabs built, the large scale windows integrated, the innovative railing system surrounding the building with the same pinched motifs that we saw first on a piece of checked paper, we already now know that this work of art will come to life. But what makes it really beautiful is when this work of art will not exist only as an end in itself but when it becomes a liveable space and flat. If these two are achieved, i.e. the work of art is completed and there is someone that calls it their home, then I believe that, with this combine, we have created the end product we wanted.

Author
Magócsi Anikó
When a dreamt-of work of art becomes a reality
01
00
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-building-1
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-building-2
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-building-3
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-building-4
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-building-5
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-building-6
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-building-7
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-building-8
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house
Költő-Kert-alumínium-keret-nélküli-tolóajtó-rendszer-Schüco-77-PD-HI-render-Budapest-minimal-house-2
MoreNews
01
020
2019 / 06 / 21
Nagy-Zoltán-Reynaers
Finding the right solution for the project
Unlike its other competitors, KAV was not thinking about classic “contract manufacturing” - that is, not buying material from us, making and delivering it, so to speak - but actually looking at the whole project, looking for solutions and providing additional services to the Icelandic customer.
Show more
2017 / 10 / 30
Schüco-alumínium-tolóajtó-ablak-emelő-toló-KAV-üveg-üveg-sarok-Schlotterer-80D-raffstore-minimal-house-kültér-udvar-medence-terasz-exterior
2020 / 07 / 02
Schüco-alumínium-egyedi-bejárati-ajtó-tolóajtó-ablak-emelő-toló-KAV-minimal-house-kültér-exterior
This is how we can extend the life of aluminium doors and windows
Long service life, high quality, exceptional durability and a modern look. Usually, these considerations also play a role in someone’s choice of aluminium doors and windows for their family home. Although distributors often advertise that aluminium front doors and windows are maintenance-free, there are a few things that we can do, not only to increase their service life but also preserve their appearance.
Show more
2019 / 10 / 24
kav-production-unit-in-kisber
KAV production unit in Kisbér
Our company has started an investment in Kisbér in Komárom-Esztergom County. In addition to the production tasks, we will also carry out a number of preparatory and design work tasks at the factory's 3-acre site and their offices near the city. Károly Lovász, Managing Director of KAV, gives an insight into the possibilities and future plans of the new special windows and doors factory.
Show more
2022 / 08 / 04
alumínium-nyílászáró-gyártás-zsaluzia-árnyékolás-egyedi-Renson-Schlotterer-Warema-Reynaers-Schüco-cnc-automatizálás-ipar40-ablakgyár-ablakgyártó-üzem-raktár
Development by KAV of customised shades
The hot and dry summers experienced over the last few years due to climate change have made suitable shading solutions ever more important. However, the standard systems available on the market do not meet individual customer needs either in terms of movement mechanisms or their form. That is why KAV’s engineers are offering customised aluminium shades that reflect contemporary trends in building. Károly Lovász, Managing Director of KAV, provides an insight into these special solutions.
Show more
2023 / 06 / 12
Reynaers-aluminium-nyilaszaro-Kenyeres-Laszlo-epitesz-latvanyterv
Windows in the Design Process from an Architect’s Perspective
The question of when to engage window experts in the design process often arises. In this context, architect and head of the Archista architectural firm, László Kenyeres, shares his experiences. He believes that in today's architectural design process, windows and doors are a critical aspect because they represent one of the most complex parts of a building. Therefore, even those not well-versed in the world of windows may require external assistance to confidently complete an execution plan.
Show more
2022 / 09 / 22
Schuco-aluminium-emelo-tolo-erkelyajto-ajto-ablak-nappali-dolgozo-szoba-uveg-epiteszet-minimal-house-belter-interior
The Basics of Doors and Windows – A Conversation with Architect György Hoffmann
Huge, transparent surfaces that create almost a direct connection with the surroundings. Architect György Hoffmann believes that in modern architecture, there is no longer a need for walls, as windows and pillars can also fulfill the structural functions. Our conversation also reveals what primarily influences the thinking of architect-designers and what it takes to establish a common language between the client and the designer.
Show more
2017 / 11 / 30
Schuco-aluminium-ablak-emelo-tolo-ajto-fuggonyfal-homlokzat-burkolat-ferde-teto-burkolat-uveg-epiteszet-kulter-exterior
A statue-like, contemporary family home
A building awarded an ALUTA award of excellence with an architect’s eye
Show more
2019 / 07 / 07
Schüco-alumínium-keret-nélküli-tolóajtó-frameless-slide-door-porsche-design-PD77-minimal-house-exterior-lemezburkolat-lemez-homlokzat-panel-napelem
A smart home requires a different kind of building use awareness
Smart homes are no longer a feature of futuristic novels and films but a part of our present. When building premium-class homes, automation and building systems that help its inhabitants’ live are often a basic requirement, which also affects the design of windows and doors. Our new series introduces you to the world of smart homes. Our goal is to provide adequate knowledge for decision-making and for starting the design of a house.
Show more
2021 / 05 / 03
alumínium-ablak-függönyfal-nyilászáró-jumbo-nagy-méretű-üvegezés-üveg-üvegpanel- egyedi-beemelés-ablak-beépítés-üvegező-robot-pókdaru
Choose big aluminium windows and doors!
The use of aluminium doors and windows in family homes allows increasingly large glass surfaces to appear in residential buildings. Because we spend a large part of our time indoors, high-transparency aluminium windows and sliding doors help to create an almost direct connection with the environment. We discussed with Károly Lovász, the managing director of KAV Hungária, why it is worth choosing large doors and windows.
Show more
2023 / 04 / 26
Schuco-aluminium-nyilaszaro-karbon-elleni-harca-2023
BAU FAIR 2023: The Battle of the Construction Industry Against Carbon
The "BAU 2023" construction industry trade fair took place in Munich from April 17 to 22, 2023. This exhibition is the largest and most significant construction industry event in Europe, providing guidance every two years on planning and construction technologies, building material production, and installation techniques. KAV Hungária sent eight engineers to Germany to process the valuable information and reconsider their domestic and international sales strategy.
Show more
2022 / 05 / 26
Farkas-Gábor-Sika-Magyarország
Aluminium windows and doors and the gluing technique
Unique windows and doors, large glass surfaces and narrow frames would not have become part of our building culture without developments in gluing technology. We talked to Gábor Farkas, head of the industrial glue technology division at Sika Hungária Kft., about the special fixing and sealing processes and innovations that have emerged in this field over the past decade. The cooperation between KAV and Sika goes back many years. In the beginning, they only supplied sealing materials for glass-to-glass connections made on-site, but today they supply KAV's factory workers and installation team with special materials and tools, and also train our engineers.
Show more
2024 / 02 / 14
THOSE ABOUT WHOM WHO NOBODY EVER TALKS, OR THE EMINENCES OF MANUFACTURING PREPARATION
THOSE ABOUT WHOM WHO NOBODY EVER TALKS, OR THE EMINENCES OF MANUFACTURING PREPARATION
KAV’s customers come into contact with several of our colleagues in the bidding, preparation and construction processes in the course of a job. These are our sales and estimation colleagues, our technical and manufacturing preparation engineers, our project engineers, and then our installation specialists. It is very rare that the end-user comes into contact with the manufacturing preparation engineers. In this article, we’d like to describe the work of these professionals in connection with the Continental Golf Club construction project.
Show more
2018 / 12 / 19
Hamburg-ALUTA-szakmai-tanulmányút-épület-látogatás
Old buildings with a new function
Hamburg, the third busiest port town in Europe, was the destination of the professional trip organised for ALUTA (aluminium window and facade association) members, on which László Cserki and Károly Lovász represented KAV Hungária. We had a conversation with Károly Lovász about the German town’s urban and architectural concepts and one of the newest emblematic buildings of Europe, the Elbphilharmonie.
Show more
2021 / 09 / 16
leica-3d-szkenner
3D scanner for the most accurate design, manufacture and installation of aluminium doors and windows
Prior to manufacturing aluminium doors and windows, KAV’s staff pay special attention to the technical preparation and professional planning. In order to have the most detailed information possible (not only for our employees, but also for our customers) we have expanded our instrumentation with one of the most modern 3D scanners. We talked to Péter Nagy, one of KAV's project engineers, about how the instrument works and what kind of information it provides to helps the work of the various trades.
Show more
2022 / 07 / 04
Aluta-Nívódíj-2022-KAV
The ALUTA awarded two KAV buildings
After the successes of recent years, this year two KAV buildings were honored with the only recognition of Hungarian aluminum door and façade manufacturers, ALUTA Nívódíj. In the small project category, which includes residential buildings, the KAV project "Költőkert" in Mártonhegy, Budapest, was awarded the ALUTA Nívódíj. In the large foreign project category, our solutions for the Marriott Hotel in Iceland were recognized.
Show more
2020 / 08 / 05
Andrey-Klymenko-Reynaers-Aluminium
Our goal is continuous growth
Belgium-based Reynaers is a leading European specialist in the development and marketing of innovative and sustainable aluminium solution for windows, doors, curtain walls, sliding systems. They are one of the leading players among main producers of aluminium systems on the markets they are present. On some markets they are a market leader in several product areas and on some others they want always be in the top three. The construction of the façade solutions for the Marriott Hotel Edition in Iceland was the first major joint project with our company, which has since been followed by several collaborations. Sustainability, innovation and tailor-made solutions are the key pillars of their specific corporate culture. We discussed key directions and opportunities for development with Andrey Klymenko, General Manager for Central and Eastern Europe at Reynaers Aluminium.
Show more
2019 / 01 / 28
Schüco-ASE-67-PD-keret-nélküli-tolóajtó-rendszer-vízszintes-metszet
What direction will the construction industry take?
Report on the BAU MESSE exhibition in Munich
Show more
2022 / 10 / 20
Reynaers-hifinity-minimal-interior-luxury-glass-keret-nelkuli-sliding-door
Huge glass walls in a villa with breathtaking features
The glass is the soul of the villa designed by architect Péter Koch, the head of Nara Studio. The unique, distinctive building achieves its floating effect through the almost endless glass surfaces, providing the owner with a perfect panoramic view and an unparalleled sense of connection with the environment. We asked the architect about the design process of the building and the collaboration between the various aspects of the project.
Show more